University of Botswana 450-Bed Academic Hospital – Mechanical Services Design Audit

Independent audit of the mechanical services design for the University of Botswana 450-bed Academic Hospital, focusing on completeness, anticipated performance and opportunities for value engineering.

Gaborone, Botswana
2010
P288,000,000.00 (estimate)
University of Botswana 450-Bed Academic Hospital – Mechanical Services Design Audit

Audit Scope

The audit examined the proposed mechanical services design for the 450-bed academic hospital, focusing on plant capacities, distribution systems, terminal equipment and infection control strategies.

  • Cooling and heating plant capacity review
  • Chilled water pumping and piping adequacy assessment
  • Air handling equipment performance evaluation
  • Active chilled beams analysis
  • Air filtration and infection control review
  • Value engineering and cost optimisation recommendations

Key Findings & Outcomes

  • Reviewed adequacy of cooling and heating plant and primary distribution pipework
  • Assessed active chilled beams and air handling strategies for clinical environments
  • Identified potential improvements to filtration and infection control measures
  • Provided value engineering recommendations to optimise capital and operating costs