University of Botswana 450-Bed Academic Hospital – Mechanical Services Design Audit
Independent audit of the mechanical services design for the University of Botswana 450-bed Academic Hospital, focusing on completeness, anticipated performance and opportunities for value engineering.
Gaborone, Botswana
2010
P288,000,000.00 (estimate)
Audit Scope
The audit examined the proposed mechanical services design for the 450-bed academic hospital, focusing on plant capacities, distribution systems, terminal equipment and infection control strategies.
- Cooling and heating plant capacity review
- Chilled water pumping and piping adequacy assessment
- Air handling equipment performance evaluation
- Active chilled beams analysis
- Air filtration and infection control review
- Value engineering and cost optimisation recommendations
Key Findings & Outcomes
- Reviewed adequacy of cooling and heating plant and primary distribution pipework
- Assessed active chilled beams and air handling strategies for clinical environments
- Identified potential improvements to filtration and infection control measures
- Provided value engineering recommendations to optimise capital and operating costs
