Sir Seretse Khama International Airport – New Terminal Building

Design and construction supervision of mechanical services for a new international terminal building with capacity for 500 passengers, featuring chilled water HVAC, sprinklers, smoke ventilation, gas suppression and wet services.

Gaborone, Botswana
28 July 2015
BWP 400,000,000.00
Sir Seretse Khama International Airport – New Terminal Building

Mechanical & Building Services Scope

The project provided full mechanical services for the new terminal building, with emphasis on airport operational reliability, passenger comfort and integrated life safety systems.

  • HVAC installations (3,600 kW chilled water system)
  • Closed control systems in control rooms
  • Automatic sprinkler installations
  • Smoke ventilation systems
  • Gas suppression systems in control rooms
  • Wet services and building monitoring system

Key Outcomes & Challenges

  • Close coordination with the Department of Buildings and Engineering Services and other stakeholders
  • Detailed thermal design of the chilled water air conditioning system
  • Comprehensive life safety systems design including sprinklers, smoke ventilation and gas suppression
  • Intensive construction supervision due to non-specialist contractor delivering services in-house