Botswana Meat Commission – Maun Abattoir Upgrading
Refurbishment and upgrading of the Botswana Meat Commission abattoir in Maun, covering abattoir equipment, steam generation, refrigeration, water treatment and HVAC services.
Maun, Botswana
2011
P75,000,000.00 (estimate)
Mechanical & Building Services Scope
The project focused on upgrading critical abattoir systems and ensuring reliable process utilities, refrigeration, and environmental control to support meat processing operations.
- Abattoir processing equipment
- Boilers and steam reticulation
- Ammonia absorption refrigeration plant
- Water storage and treatment plant
- HVAC, kitchen and laundry equipment
- River water pumping station
Key Outcomes & Challenges
- Significant process water demand of around 300 m³ per day
- Augmented limited local authority supply with on-site river abstraction and treatment
- Integrated treatment and storage system using Thamalakane River water
- Coordinated mechanical and process installations within an operating abattoir environment
